Consent Details
Order No:AW-348590
PCBID:106156
INW ID:214544
Classification:RED/LARGE
Issue Date:03/05/2025
Fee Paid:₹ 4,68,000
Products & Activities
- Educational institution (Existing BUA: 37,997 sqm)
- Hostel & staff quarters (Expansion BUA: 24,337.42 sqm)
STP Capacities
STP 1 (Existing)
280 KLD
STP 2 (Expansion)
250 KLD
STP Capacity Analysis
With a community of 2,773 students and 80 staff members, the total wastewater generation is approximately 300.38 KLD.
Our combined STP capacity is 530 KLD (280 KLD + 250 KLD), which means the current operational load is only at ~57% of the total capacity.
This leaves a substantial buffer of ~230 KLD, ensuring the system is well-equipped for future needs and peak loads.
Water Usage (KLD)
Air Emission Sources
| Source | Capacity | Fuel | Control Measure |
|---|---|---|---|
| D.G. Set 1 | 500 KVA | Diesel | Acoustic Enclosures (AEC) |
| D.G. Set 2 | 500 KVA | Diesel | Acoustic Enclosures (AEC) |
| D.G. Set 3 | 500 KVA | Diesel | Acoustic Enclosures (AEC) |
Key Terms & Conditions
- The applicant shall not allow discharge from other premises to mix with the discharge from their premises.
- An Environmental Cell with qualified personnel must be established and maintained.
- The Board reserves the right to review, impose additional conditions, revoke, or alter the terms of this consent.
- Any accidental discharge of emissions/effluents in excess of standards must be reported to the Board immediately.
- Alternate power supply must be sufficient to operate all pollution control equipment.
- The applicant must apply for consent renewal at least 120 days before the current consent expires.
- An adequate green belt must be developed and maintained around the periphery of the premises.
- A rainwater harvesting system and proper storm water management must be implemented and maintained.
- An annual Environmental Statement (Form-V) must be furnished for each financial year before the end of September.